New Tenekil Plus Total Termite Control
₨ 650 – ₨ 2,650Price range: ₨ 650 through ₨ 2,650
NEW TENEKIL PLUS
USAGE
Pre-Construction
One part of New Tenekil plus Mixed with eighty parts of water to make 1.25% solution. Solution to be applied at the rate of 5 liters per 10 square feet to be whole area. After excavation of foundation this solution to be applied again at the rate of 5 liters per 10 square feet on the surface. Final application to be made after earth filling and soiling at the rate of 5 liters per 10 square feet.
Post Construction
Drill holes inside the building on the floor along the walls and wooden door frames. Fill them with 1.25% solution and then close them. Distance between holes in the flooring should be between 2 to 3 feet. Holes should be drilled up to soil level. For trench to be dug along the foundations of the building. Inject Treatment of surrounding area, a foot deep and d a foot wide the trench with 1.25% New Tenekil Plus solution at the rate of liters per cemented, then the same method of drilling holes in the floor, square feet. If the surrounding area is used for inside treatment, may be followed.
NEW TENEKIL PLUS
USAGE
Pre-Construction
One part of New Tenekil plus Mixed with eighty parts of water to make 1.25% solution. Solution to be applied at the rate of 5 liters per 10 square feet to be whole area. After excavation of foundation this solution to be applied again at the rate of 5 liters per 10 square feet on the surface. Final application to be made after earth filling and soiling at the rate of 5 liters per 10 square feet.
Post Construction
Drill holes inside the building on the floor along the walls and wooden door frames. Fill them with 1.25% solution and then close them. Distance between holes in the flooring should be between 2 to 3 feet. Holes should be drilled up to soil level. For trench to be dug along the foundations of the building. Inject Treatment of surrounding area, a foot deep and d a foot wide the trench with 1.25% New Tenekil Plus solution at the rate of liters per cemented, then the same method of drilling holes in the floor, square feet. If the surrounding area is used for inside treatment, may be followed.
| Ml |
100 ml ,1000 ml ,500 ml |
|---|
MAECENAS IACULIS
Vestibulum curae torquent diam diam commodo parturient penatibus nunc dui adipiscing convallis bulum parturient suspendisse parturient a.Parturient in parturient scelerisque nibh lectus quam a natoque adipiscing a vestibulum hendrerit et pharetra fames nunc natoque dui.
ADIPISCING CONVALLIS BULUM
- Vestibulum penatibus nunc dui adipiscing convallis bulum parturient suspendisse.
- Abitur parturient praesent lectus quam a natoque adipiscing a vestibulum hendre.
- Diam parturient dictumst parturient scelerisque nibh lectus.
Scelerisque adipiscing bibendum sem vestibulum et in a a a purus lectus faucibus lobortis tincidunt purus lectus nisl class eros.Condimentum a et ullamcorper dictumst mus et tristique elementum nam inceptos hac parturient scelerisque vestibulum amet elit ut volutpat.
